Project - Smithsonian Support Center Door Replacement
| Offeror Name: |
FBDC |
| Contract Number: |
0012 |
| Total Dollar Amount: |
$ 243,846.68 |
| Procurement Agency/Customer: |
Washington DC USACE |
| Title of Contract: |
Replace Doors & Hardware @ Elevator Lobby |
| Contract Type: |
Lump Sum |
| Period of Performance: |
March 2004 – Present |
Primary Customer Points of Contact:
Washington DC USACE
Paul Ramey 202-730-3767
Gary Poling 410-320-9413
|
|
|
|
Brief Description of Smithsonian Support Center
Door Replacement:
In March of 2004, the Fort Berthold Development Corporation
was awarded the Door Replacement project at the Smithsonian
Support Center in three (3) different Pods. Pods 1 and
2 have standard security but Pod 3 has a high security
due to explosive materials within the Pod. The project
entails removal and replacement of 18 pairs of 3 hour
rated pre-painted metal doors and hardware. In association
with replacing the doors additional work is needed.
That is, relocating the smoke detectors, adding a timer
releases, magnetic hold opens, controls for electric
locks, fire alarm controls, and a card reader. The magnetic
hold opens are supported with a specially designed steel
support. The magnetic hold opens are placed to hold
the doors open at various different angles. Close detail
was needed to ensure the proper angle. In Pod 3 the
materials must be explosion proof. FBDC had to construct
a sealed barrier to ensure the safety of our work forces
as well as the SSC’S employees. FBDC is working
closely with the SSC and the ACOE to ensure security
and safety of the items within the Pod Storage Area.
|
|
|
 |
Tribal Owned 8A with Open Task Order Construction (TOCC) Contract.
Contract # DACA31-01-D-0046
IDIQ Omaha USACE
Contract # W9128F-06-D-0029
25 Million 5 Years
National IDIQ Department of Interior
Gov Works
Contract # 0406-CT-60704
50 Million 5 Years
Small Business
Administration
|
|
|
|
|
| |