Project - ARL CENTER FLYWHEEL UPS
| Offeror Name: |
FBDC |
| Contract Number: |
0011 |
| Total Dollar Amount: |
$ 649,601.00 |
| Procurement Agency/Customer: |
Baltimore USACE |
| Title of Contract: |
ARL Center Flywheel UPS |
| Contract Type: |
Lump Sum |
| Period of Performance: |
September 2003 - August 2004 |
Primary Customer Points of Contact:
Baltimore USACE
Alan Andrysiak 301-677-0263
|
|
|
|
Brief Description of the ARL Center Flywheel
UPS Project:
In September 2003, the Fort Berthold Development Corporation
was awarded the above contract, which was completed
in August 2004. FBDC was to provide a technical design
and construction of a turnkey for two Rotary UPS unites
in Bldg. 207. The technical design included an electrical
load study, tie in the new UPS into the existing system,
and design the proper location for the units to help
keep costs to a minimum, and compare three different
manufacturers and supply the government with the best
overall product. FBDC had to construct and install the
new UPS system while the government employees were working
in the area. FBDC coordinated closely with the user
as to control the least amount of disturbances. The
outages that were scheduled had to be planned at least
two and a half weeks prior to the work being completed.
The outages were completed when scheduled and in the
shortest amount of time.
|
|
|
 |
Tribal Owned 8A with Open Task Order Construction (TOCC) Contract.
Contract # DACA31-01-D-0046
IDIQ Omaha USACE
Contract # W9128F-06-D-0029
25 Million 5 Years
National IDIQ Department of Interior
Gov Works
Contract # 0406-CT-60704
50 Million 5 Years
Small Business
Administration
|
|
|
|
|
| |