Project - ARL CENTER FLYWHEEL UPS

Offeror Name: FBDC
Contract Number: 0011
Total Dollar Amount: $ 649,601.00
Procurement Agency/Customer: Baltimore USACE
Title of Contract: ARL Center Flywheel UPS
Contract Type: Lump Sum
Period of Performance: September 2003 - August 2004

Primary Customer Points of Contact:

Baltimore USACE
Alan Andrysiak 301-677-0263

 

 

Brief Description of the ARL Center Flywheel UPS Project:

In September 2003, the Fort Berthold Development Corporation was awarded the above contract, which was completed in August 2004. FBDC was to provide a technical design and construction of a turnkey for two Rotary UPS unites in Bldg. 207. The technical design included an electrical load study, tie in the new UPS into the existing system, and design the proper location for the units to help keep costs to a minimum, and compare three different manufacturers and supply the government with the best overall product. FBDC had to construct and install the new UPS system while the government employees were working in the area. FBDC coordinated closely with the user as to control the least amount of disturbances. The outages that were scheduled had to be planned at least two and a half weeks prior to the work being completed. The outages were completed when scheduled and in the shortest amount of time.

 


 

 





Contract Vehicles

Tribal Owned 8A with Open Task Order Construction (TOCC) Contract.
Contract # DACA31-01-D-0046

IDIQ Omaha USACE
Contract # W9128F-06-D-0029
25 Million 5 Years

National IDIQ Department of Interior
Gov Works
Contract # 0406-CT-60704
50 Million 5 Years

Small Business Administration

 

Featured Projects


US State Capitol Visitors Center


Smithsonian Air & Space Museum

Ft. Myer Gates
Click here to view other projects...

 

Home | About Us | Partners | Projects | Resources | Contact Us

© 2005 Fort Berthold Development Corporation. All rights reserved.